I should start off this blog post by warning everybody that our main floor bathroom is not completely done. Let's call "Phase 1" complete. 

Phase 1:
  • Paint the room
  • Replace the counter top with granite (and a built in sink).
  • Update the handles on the medicine cabinet and the vanity.
  • Install a new faucet
  • Replace the light fixture
  • Get a new mirror (preferably framed)
Phase 2:
  • Replace the doors with new white ones
Phase 3:
  • Replace the tiling which I am not sure will ever happen since this is not our forever home and even talking to Dan about it gives him the "heebie jeebies."
Dan did ALL of the work. I take zero credit for any of this. My handy hubby!

Without further ado.... 

 
Old counter top with new faucet


Surprise! A hole in the wall when we took down the side splash. Thanks previous owners!

New paint, granite, faucet and mirror

Also showing off the new handles

Up close and pretty

New decora switch and fancy fan. Gotta love the tile